Completed in 2001, the existing Chesapeake Energy campus restaurant was at capacity. An adjacent outdoor patio dining area was the only opportunity for expansion. The site is an existing outdoor patio built alongside an existing natural creek.
image 1
Completed in 2001, the existing Chesapeake Energy campus restaurant was at capacity. An adjacent outdoor patio dining area was the only opportunity for expansion. The site is an existing outdoor patio built alongside an existing natural creek.